Skip to main contentCart
Roger Wilco Aviation Services
FAA CERT. REPAIR STATION · AVIONICS · AIRFRAME & POWERPLANT · NDT · FABRICATION
Cert. No. RWSR491E
RWAS Avionics Desk · KYKN · Yankton, SD
FAA Part 145 Repair Station · Cert. RWSR491EAuthorizedGarminDealerAEA MemberNBAA Member

Expanded image for Kit 83, GFC500 Install, Yaw Damp Servo

Kit 83, GFC500 Install, Yaw Damp Servo
01
Kit 83, GFC500 Install, Yaw Damp Servo

From the workbench

Kit 83, GFC500 Install, Yaw Damp Servo

Garmin kit components and part numbers are listed below.

Kit 83, GFC500 Install, Yaw Damp Servo

Garmin part number K11-00024-83.

This is a dealer-only Garmin avionics item. Contact RWAS to confirm aircraft eligibility, installation requirements, and pricing.

Kit 83, GFC500 Install, Yaw Damp Servo — kit contents

Garmin kit P/N K11-00024-83 includes these documented components:

  • CAPSTAN KIT, SPIRAL — Garmin P/N 011-02951-10 (qty 1)
  • SERVO, GSA 28 — Garmin P/N 011-02927-11 (qty 1)
  • CONNECTOR KIT, GSA 28 — Garmin P/N 011-04755-00 (qty 1)
  • CABLE CONNECTION LINK — Garmin P/N 115-03577-01 (qty 2)
  • PITCH AND YAW SERVO PUSHROD END PLATE — Garmin P/N 115-03747-00 (qty 4)
  • PUSHROD END PLATE BUSHING — Garmin P/N 117-01755-00 (qty 4)
  • PUSHROD BOLT BUSHING — Garmin P/N 117-01760-00 (qty 2)
  • YAW SERVO CABLE ASSEMBLY — Garmin P/N 233-20167-02 (qty 1)
Order & fulfillmentGarmin components are ordered directly from Garmin in Kansas, shipped to our facility, then shipped directly to you. Turn-around time can vary. The best course of action is to call us to confirm availability.
Warranty & serviceWarranty for Garmin product is shipped back to Garmin for repair or replacement. Warranty for labor of installation is life-time (conditions apply).
Talk to a pilotCall (605) 299-8178 — staffed by pilots and A&Ps, not a call center.
Related serviceGarmin avionics installation
Certified Garmin dealer support for panel planning, installation, testing, and documentation.
Related serviceGFC 500 autopilot installation
Eligibility review, servo placement, integration, functional testing, and return-to-service paperwork.